Sizing of power cables for circuit breaker controlled feeders (part 3) | EEP

dV1 is the drop from source (Transformer) to load center (PCC) which should be less than or equal to 3%. Feeder connecting source to load center is also known as primary feeder. dV2 is the drop from load center (PCC) to individual loads which should be le